xrayabsorption.org
  • Tutorials, Books, and other Resources
  • Videos of Lectures and Demos
  • Training Workshops and Short Courses
  • Software
  • Databases
  • Experiments
  • Applications
  • Theory
  • Analysis
  • Related Techniques
  • Acronyms and Terms for X-ray Absorption Spectroscopy
  • Community
  • About this site
xrayabsorption.org
  • <no title>
  • View page source

  • Energy Calibration Standards
    • What purpose does the calibration standard serve?
    • How is the calibration standard used?
  • How to replace a broken mylar window on a Lytle Chamber
    • Step 1. Taking the plate apart from the detector
    • Step 2. Stretching the aluminized mylar
    • Step 3. Epoxy the Ring to Mylar
    • Step 4. Screw the two halves of the front ring together
    • Step 5: Re-assemble the stack of conducting rings
    • Step 6: Re-attache the BNC connectors
    • Step 7. Final assembly
  • Sample-related distortions to measured data
    • Tutorials and software
    • Literature references
  • Preparing Doubly Contained Samples for XAS Measurement
    • Step 0: Preparing your sample
    • Step 1: Preparing the kapton tape
    • Step 2: Cover one side of the sample frame
    • Step 3: Load the sample
    • Step 4: Finishing off the sample holder
    • Step 5: Preparing the secondary containment.
    • Step 6: Finishing the secondary containment
    • Further considerations

© Copyright Public Domain. See About for Auhtors.

Built with Sphinx using a theme provided by Read the Docs.